# Kamarajar Port Second Container Terminal 2026: Rs 4,288 Crore PPP Project Approved by Cabinet

Source page: https://rankvyuh.com/current-affairs/news/kamarajar-port-second-container-terminal-cabinet-approval-2026-ppp  ·  Section: National & Trending  ·  Published: 2026-11-25  ·  Updated: 2026-11-25  ·  Language: en
Also in Hindi: https://rankvyuh.com/hi/current-affairs/news/kamarajar-port-second-container-terminal-cabinet-approval-2026-ppp-hindi

**In one line:** On 25 Nov 2026 the CCEA approved a Rs 4,288.26 crore Second Container Terminal at Kamarajar Port (Ennore, Tamil Nadu) on PPP-DBFOT basis, adding 2.0 million TEUs a year in two phases.

## Key facts
- **Approved by:** CCEA, 25 Nov 2026
- **Project cost:** Rs 4,288.26 crore incl. GST
- **Model:** PPP on DBFOT basis
- **Capacity:** 2.0 million TEUs a year (1.1 + 0.9 in two phases)
- **Terminal:** 900 m long, 18 m design draft
- **Concession:** 40 years incl. 48 months construction
- **Largest ship:** Up to 24,346 TEUs, 400 m long
- **Dredging by KPL:** About Rs 450 crore

## Timeline
- FY 2025-26: KPL handles 49.08 million tonnes of cargo; existing container terminal at about 88% of its 0.8 million TEU capacity
- 7 Jul 2026: Ministry announces completion of Capital Dredging Phase VI; KPL becomes the second Major Port after Visakhapatnam with an 18 m draft
- 25 Nov 2026: CCEA approves the Second Container Terminal at KPL on PPP-DBFOT basis
- Month 25 after award: Phase I (1.1 million TEUs) to begin commercial operations
- Month 49 after award: Full commercial operations after Phase II (0.9 million TEUs)

## What happened

On **25 November 2026**, the **Cabinet Committee on Economic Affairs (CCEA)**, chaired by Prime Minister Narendra Modi, approved the **Second Container Terminal at Kamarajar Port Limited (KPL)** in Tamil Nadu. The terminal will be built under the **Public Private Partnership (PPP)** mode on a **Design, Build, Finance, Operate and Transfer (DBFOT)** basis.

The estimated project cost is **Rs 4,288.26 crore, including GST**. The terminal will be **900 metres long**, have a **design draft of 18 metres** and add an annual capacity of **2.0 million TEUs** (Twenty-foot Equivalent Units), built in **two phases**.

## Background

- **The port.** Kamarajar Port Limited, formerly **Ennore Port Limited**, is one of the **12 Major Ports of India**. It is **wholly owned by Chennai Port Authority**, under the **Ministry of Ports, Shipping and Waterways**. It lies on the east coast of Tamil Nadu, near the Chennai industrial region, and handles coal, petroleum, oil and lubricants, LNG, LPG, containers, automobiles and general cargo.
- **Deeper water already in place.** On **7 July 2026**, the Ministry announced that KPL had completed **Capital Dredging Phase VI** (about **Rs 440 crore**). With an **18-metre operational draft**, KPL became the **second Major Port after Visakhapatnam Port** to offer an 18-metre draft, and can now take fully laden **Capesize** vessels of up to **1,70,000 DWT**.
- **Capacity is running short.** The existing container terminal has an installed capacity of **0.8 million TEUs a year**. In **FY 2025–26** it handled about **0.7 million TEUs**, which is about **88% utilisation**.

## Key details

| Item | Detail |
|---|---|
| Approved by | CCEA, 25 Nov 2026 |
| Project | Second Container Terminal, Kamarajar Port Limited (Ennore, Tamil Nadu) |
| Model | PPP, DBFOT |
| Cost (PPP part) | Rs 4,288.26 crore incl. GST: Phase I Rs 2,429.32 crore, Phase II Rs 1,858.94 crore |
| Dredging | About Rs 450 crore, to be borne by KPL |
| Terminal size | 900 m long, 30 m berth width, 18 m design draft |
| Capacity | 2.0 million TEUs a year: Phase I 1.1 million, Phase II 0.9 million |
| Largest ship | Up to 24,346 TEUs and 400 m length overall |
| Concession period | 40 years, including 48 months of construction |
| Schedule | Phase I done within 24 months of award, operations from month 25; Phase II built in months 25–48, full operations from month 49 |
| Selection | Transparent, open global bidding |
| Cost to the Centre | None for the PPP part; the concessionaire raises the money and recovers it through user charges |
| Jobs | About 750 (direct and indirect) during construction; about 800 during operation |

**Port performance (FY 2025–26), as per the release:** 49.08 million tonnes of cargo, 1,008 vessels, more than 7 lakh TEUs of containers, revenue of about Rs 1,280 crore and Profit Before Tax of Rs 924 crore. KPL's container traffic grew at about **9.9% CAGR** over five years against about **7%** for India as a whole; its total cargo grew at a CAGR of **13.64%**.

**Other CCEA/Cabinet decisions of the same day (PIB):** a **Rs 11,000 crore** scheme for the Construction and Infrastructure Equipment (CIE) manufacturing ecosystem under the Ministry of Heavy Industries; a **greenfield airport at Doloo, Silchar (Assam)** by the Airports Authority of India at **Rs 2,014 crore**; and continuation of two Department of Posts schemes for FY 2026-27 to FY 2030-31: **Postal Operations (Rs 1,141 crore)** and **Estates Management (Rs 1,491 crore)**.

## Why it matters

- **Room for growth.** With the existing terminal near 88% use, the new 2.0 million TEUs more than triples KPL's container capacity once both phases run (0.8 to 2.8 million TEUs).
- **Bigger ships, direct calls.** The release says the 18-metre draft and large-vessel design should allow **direct calls by mainline vessels** and **reduce dependence on foreign deep-water hub ports** and the feeder costs that come with them.
- **Hinterland industry.** The release names automobiles and auto components, engineering goods, electronics and chemicals as key cargo sectors, and says the terminal will improve logistics support for industries in **Tamil Nadu, Karnataka, Andhra Pradesh, Telangana** and the adjoining hinterland.
- **Policy fit.** The government links the project to **Maritime India Vision 2030**, **Maritime Amrit Kaal Vision 2047** and **Atmanirbhar Bharat**.
- **Fiscal model.** Under DBFOT the private concessionaire finances the terminal, so the Centre adds capacity without spending budget money on the PPP part.

## Issues and criticism

The release itself points to the conditions on which the project depends:

- **Demand risk.** The case rests on the feasibility study's projection of continued container growth in the south-eastern region. If traffic grows slower, a private operator may find the terminal less attractive.
- **Clearances.** The proposal requires environmental and other clearances to be obtained "in a time-bound manner before the bid due date". Delays here would push back the award and the 24-month Phase I clock.
- **Public money still involved.** The Centre bears no cost for the PPP part, but KPL has to spend about **Rs 450 crore on dredging**.
- **User charges.** The concessionaire recovers its investment through user charges under the concession agreement and tariff framework, so the final cost to shippers will depend on that framework and on the winning bid.

## Way forward

- Run the open global bidding on schedule and secure clearances before the bid due date, as the proposal requires.
- Complete the dredging that KPL is to bear (about Rs 450 crore) in step with terminal construction.
- Match port capacity with road and rail links to the hinterland so that the added TEUs actually move.
- Compare Phase I traffic with the feasibility study's projections while Phase II is built (months 25–48).

For revision, attempt the [weekly current affairs quiz](/current-affairs/weekly-quiz).

## Prelims pointers

- Kamarajar Port Limited was formerly **Ennore Port Limited**; it is one of India's **12 Major Ports**.
- KPL is **wholly owned by Chennai Port Authority** under the Ministry of Ports, Shipping and Waterways.
- Approval body: **CCEA**, chaired by the Prime Minister, on **25 Nov 2026**.
- **DBFOT** = Design, Build, Finance, Operate and Transfer; **TEU** = Twenty-foot Equivalent Unit.
- Cost: **Rs 4,288.26 crore** incl. GST; capacity **2.0 million TEUs**; **900 m** terminal; **18 m** design draft.
- Concession: **40 years**, including **48 months** of construction.
- KPL is the **second Major Port after Visakhapatnam** with an 18-metre draft (Ministry release, 7 Jul 2026).

## One-liners for SSC, Banking and Railways

- The Second Container Terminal approved on 25 Nov 2026 is at **Kamarajar Port, Ennore (Tamil Nadu)**.
- Project cost: **Rs 4,288.26 crore**; capacity: **2.0 million TEUs a year**.
- The project uses the **PPP–DBFOT** model with a **40-year** concession.
- Phase I adds **1.1 million TEUs**; Phase II adds **0.9 million TEUs**.
- The terminal can handle ships of up to **24,346 TEUs** and **400 m** length.
- Same day, the Cabinet approved a **Rs 2,014 crore** greenfield airport at **Doloo, Silchar (Assam)**.

## Mains practice question

**"Port capacity built through PPP can cut India's logistics costs only if risks are shared well." Examine this with reference to the Second Container Terminal at Kamarajar Port. (GS III, 250 words)**

Points to cover:
1. Project facts: DBFOT, Rs 4,288.26 crore, 2.0 million TEUs, 18 m draft, 40-year concession.
2. Benefits: mainline ship calls, less reliance on foreign hub ports, support for southern manufacturing clusters, no Central outlay on the PPP part.
3. Risks: traffic projections, clearances before bidding, dredging cost on KPL, tariff and user charges.
4. Way forward: timely bidding, hinterland road and rail links, and phase-wise review against Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047.

## Exam angle
- **UPSC:** GS III: infrastructure (ports), PPP models, logistics costs; Prelims: Major Ports, DBFOT, TEU
- **SSC:** Static plus current GK: Kamarajar (Ennore) Port in Tamil Nadu, cost and capacity of the new terminal
- **Banking:** Infrastructure financing through PPP-DBFOT; Cabinet decisions of 25 Nov 2026 with outlays
- **Railways:** One-liners: port name, state, capacity 2.0 million TEUs, cost Rs 4,288.26 crore
- **State PSC:** Tamil Nadu economy: Chennai-Ennore industrial region and port-led growth

## Key terms
- **DBFOT:** Design, Build, Finance, Operate and Transfer: a private firm designs, builds, funds and runs the asset for a fixed period, then hands it back
- **TEU:** Twenty-foot Equivalent Unit, the standard unit for counting container capacity
- **Design draft:** Water depth the berth is designed for, which limits how deep-loaded a ship can come alongside
- **CCEA:** Cabinet Committee on Economic Affairs, chaired by the Prime Minister, which clears major economic and investment proposals

## Sources
- [PIB (CCEA), 25 Nov 2026: Cabinet approves development of the Second Container Terminal at Kamarajar Port Limited under PPP mode on DBFOT basis](https://pib.gov.in/PressReleasePage.aspx?PRID=2341174)
- [PIB (Ministry of Ports, Shipping and Waterways), 7 Jul 2026: Kamarajar Port becomes India's second Major Port with 18-metre draft capability](https://www.pib.gov.in/PressReleasePage.aspx?PRID=2282243)
- [PIB, 25 Nov 2026: Cabinet approves Rs 11,000 crore scheme for Construction and Infrastructure Equipment manufacturing](https://pib.gov.in/PressReleasePage.aspx?PRID=2341171)
- [PIB (CCEA), 25 Nov 2026: Cabinet approves Greenfield Airport at Doloo, Silchar, Assam](https://pib.gov.in/PressReleasePage.aspx?PRID=2341175)
- [PIB, 25 Nov 2026: Cabinet approves continuation of Postal Operations Scheme (Rs 1,141 crore)](https://pib.gov.in/PressReleasePage.aspx?PRID=2341179)
- [PIB, 25 Nov 2026: Cabinet approves continuation of Estates Management Scheme for Department of Posts (Rs 1,491 crore)](https://pib.gov.in/PressReleasePage.aspx?PRID=2341181)

---
Published by RankVyuh (https://rankvyuh.com), checked against the sources above. Quiz for this article: https://rankvyuh.com/current-affairs/news/kamarajar-port-second-container-terminal-cabinet-approval-2026-ppp#quiz
