Current affairs
MoEFCC's ELV Amendment Rules, 2026 (S.O. 6326(E), 20 Nov 2026) make the Rule 4(6) closure obligation apply only when a producer permanently shuts down and let EPR certificates be generated only from steel recovered from End-of-Life vehicles scrapped at RVSFs.
Key facts
Notification
S.O. 6326(E), 20 Nov 2026, MoEFCC
Parent law
Environment (Protection) Act, 1986
Amends
Environment Protection (End-of-Life Vehicles) Rules, 2025
Key facts
Rule 4(6)
Closure EPR applies only on permanent cessation of operations
Sales to report on closure
Last 15 years (transport), 20 years (non-transport)
Rule 9(2)
EPR certificates only for steel recovered from ELVs at RVSFs
Timeline
30 Jan 2024
Draft End-of-Life Vehicles (Management) Rules, 2024 published (S.O. 367(E))
6 Jan 2025
Environment Protection (End-of-Life Vehicles) Rules, 2025 notified (S.O. 98(E))
1 Apr 2025
ELV Rules, 2025 come into force; EPR targets start from 2025-26
27 Mar 2026
Draft ELV Amendment Rules, 2026 published for comments (S.O. 1619(E))
20 Nov 2026
Final ELV Amendment Rules, 2026 notified (S.O. 6326(E))
For your exam
UPSC
GS III: Environmental pollution, waste management, circular economy and EPR; Prelims: ELV Rules 2025, RVSF, CPCB role
SSC
Static link: Environment (Protection) Act, 1986; CPCB; which ministry notifies waste rules (MoEFCC)
Railways
One-liners: 15 years for transport and 20 years for non-transport vehicles; RVSF full form
State PSC
Environment paper: vehicle scrapping, State Pollution Control Boards' role in registering RVSFs and bulk consumers
Daily current affairs on RankVyuh
End-of-Life Vehicles Amendment Rules 2026: closure-only EPR under Rule 4(6), 15/20-year sales reporting to CPCB, and EPR certificates only for ELV steel.